Warning: fopen(/home/hosting/bbs/public_html/outlogin_skin/uni4/login.html) [function.fopen]: failed to create stream: No such file or directory in /home/hosting/bbs/public_html/outlogin.php on line 93

Warning: filesize() [function.filesize]: Stat failed for /home/hosting/bbs/public_html/outlogin_skin/uni4/login.html (errno=2 - No such file or directory) in /home/hosting/bbs/public_html/outlogin.php on line 94

Warning: fread(): supplied argument is not a valid stream resource in /home/hosting/bbs/public_html/outlogin.php on line 94

Warning: fclose(): supplied argument is not a valid stream resource in /home/hosting/bbs/public_html/outlogin.php on line 95
HOME¦¢CONTACT US¦¢SITEMAP
 
 

HOME > SUPPORT > ORDER FORM
order form Download


GENERAL INFORMATION

Tag No.
Tank No.
Company Name
Name E-mail
Tel. Fax
Address



Aboveground Storage Tank Venting Device

1. Device Selection
Flame Arrester  
Breather Valve
  Free Vent Cover
Breather Valve with Flame Arrester   Emergency Cover
2. Installation
End-Line  
In-Line
     
3. Purpose of Flame Arrester
Explosion  
Longburning Proof
Detonation Proof
4. Design Data for Vent Sizing
Tank type   Setting Press./Vac. mmWC
Diameter m   Flash Point Celsius
Height /Length m   FillingRate §©/hr
Tank Capacity §©   Draw-Out Rate §©/hr
Operating Pressure mmWC   Insulation Thick In.
Max.Allowable Press. mmWC   Heating Coil Heat Btu/Lb
Max.Allowable Vac. mmWC   Inert Gas SCFH